Fast cycling assembly machine 10 stations with O-ring assembly. Cycle time 1.7 sec.
Germany
Removal of determined locking ring class (double removal) with control measurement and transfer to assembly station Locking ring assembly and testing (cycle time approx. 30 sec.)
Request for a quoteGermany
Pressing bearings Manually assemble anti-knock on hand lever press Automatically assemble and test retaining ring
Request for a quoteGermany
Differential assembly with torque and angle monitoring Positioning the 5 screwing units to screw in 2 x 5 screws in succession
Request for a quote