No results in the radius of 50km found.
Results in the radius of 250km are shown.
... logistical advantages as shorter shutdowns can also be used. Comprising a catalyst volume of up to 50 cubic metres simply requires three to five days which includes the building site installation. During the “Wildeshauser Catalyst Days” in September 2008, incineration plant owners reported their experiences with our in-situ-cleaning, in detail.
AFD-Armaturen Fertigungs- und Dienstleistungs GmbH, based in the Leuna Works in the chemical triangle of Halle-Leipzig-Bitterfeld, was founded in 1998. In October 2008, on the occasion of our 10th anniversary, we moved into a new company building with approximately 1000 m² of storage space. We plan, manufacture, or modify industrial valves, plant components, and automate valves as individual or...
... Plant, Onshore/Offshore, Water and Wastewater; Building Services. Valve Type: Valves of all kinds, including those for nuclear power plants. Pressure Range: Up to DIN PN630, ANSI 2500lbs Temperature: Up to 650 degrees C Size: Up to DN4500 Materials: 1.0619 / A216WCB, LCB, C5, C12, WC6, WC9, 1.0460 / A105, 1.7335 / A182 F12, 1.7383 / A182 F22, 1.4903 / A182 F91, 1.4901 / A182 F92, CF8M/1.4408...

The europages app is here!

Use our improved supplier search or create inquiries on the go with the new europages app.

Download in the App Store

App StoreGoogle Play