HP-DRY high pressure adsorption dryers have been designed for continuous separation of water vapour from compressed air thus reducing dew point. Operation of the dryer requires two columns operated alternately. Adsorption takes place under pressure in the first column while the second column regenerates with a portion of already dried compressed air at ambient pressure. High pressure adsorption compressed air dryer consists from control valves, controller with LED display and two columns filled with desiccant. Springs in the columns make surethat the desiccant beads will not move during operation. Proven robust design enables efficient and reliable operation, fast installation and simple maintenance.
United Kingdom
Air handler hire to match your needs Our air handling unit system are specifically designed to work with our fluid chillers and boilers to provide cool or warm air for a variety of applications. With a wide range of sizes available, from 50 to 500 kW, we can design and install air handling unit systems to fit any need – whatever your request. Our experienced team offer industrial air handler hire when you need it. We have the know-how to calculate the most complex cooling requirements, giving you a cooling package that will deliver energy and cost efficiencies. Industrial air handling units fitted for you, by our engineers Choosing air handler hire with us means that if you need to circulate air through your existing heating, ventilation and air conditioning (HVAC) systems, we can match our air handlers to your set-up. We’ll also provide all the air handling equipment needed, such as ducting, hoses and cabling as part of our air handler hire service
Request for a quoteThailand
Chemical Formula: CCI3F (dichlorofluorcmethanel2. Molecular Weight: Approximately 137.37 g/mol3. Boiling Point: Approximately -24.70C (-12.5*F)4. Critical Temperature: 198.0*0 <388.40F)5. Critical Pressure: 4.88 MPa (approximately 49 oar or 711 psi)8. Density (at 0*C and 1 atm): Approximately 1.49 kg/m" 37. Ozone Depletion Potential (ODP): Historically, R11 had a high ODP, contriouting to ozone layer depletion.8. Global Warming Potential (GWP): Historically, R11 had a high GWP, contributing to climate change.
Request for a quoteCreate one request and get multiple quotes form verified suppliers.