• europages
  • >
  • COMPANIES - SUPPLIERS - SERVICE PROVIDERS
  • >
  • scaffolding hoist

Results for

Scaffolding hoist - Import export

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

Verified by Europages

Rope hoists especially for scaffolders Two lifting speeds, an overload protection and a slack rope switch as well as a variety of different load receptacles make these fast scaffold assembly hoists the ideal tool for rationally and safely transporting scaffold components and building materials. You do not need to transport the handy drive of the rope drum to the top. It can simply be installed to the scaffold on the bottom. You can install the lightweight swivel arm in the desired height to the scaffold on the top. Quick assembly and their easily being moved are the biggest advantages of the GEDA scaffold assembly hoists. The maximum working height of 40m can be extended to 76m if you install the winch in a higher position. Apart from scaffolders, it is mainly roofers and painters who use these speedy tools to transport their materials onto the scaffold.

Request for a quote

Germany

Verified by Europages

The small, lightweight and handy GEDA 200 Z – our ideal hoist for scaffolders and construction workers. The base unit includes chassis, cable bin and trailing cable. The mast with the toothed rack can be fixed to the scaffold using only one tube. The anchoring distances are 4m. The entire unit only requires an area of 1,5 x 1,5m on the ground, which makes it possible to load the hoist parallel to the building without any problems. Unloading at the landing levels can be easily done by turning the platform. The lightweight platform (only 44 kg) can be turned by 90° to the left and to the right. The GEDA design and development team has constructed the GEDA 200 Z to be easily serviced and maintained, i.e.easy access to handy components.

Request for a quote

Do you sell or make similar products?

Sign up to europages and have your products listed

Add my business
Filters

Results for

Scaffolding hoist - Import export

Number of results

4 Products

Countries