The GEDA 300 Z with its lightweight 2 m aluminum mast segments has been used on building sites for various kinds of transport for many years. Its spacious load platform makes it the ideal rental unit for permanent use on building sites. In order to meet your demands on site, you can choose between 230V or 400V power supply for the GEDA 300 Z.
Germany
When repairing and maintaining silos, blast furnaces, co-generation plants and boilers etc, every minute and centimetre of space counts, since access is only possible through the small manhole only 45 cm in diameter. So this is precisely where the materials hoist, the GEDA 300 Z Boiler Hoist, should be deployed. The platform of the pure materials hoist can be accessed for loading/unloading and personnel may also travel in the hoist for assembling/dismantling the device. The GEDA 300 Z Boiler Hoist can be completely dismantled into its individual parts and is also popular with customers since it can be assembled and dismantled quickly by two people in only about 40 minutes. In this regard its rack and pinion design has proven its worth as the GEDA 300 Z Boiler Hoist can be assembled significantly more quickly than wire rope hoists. All connection cords are fitted with plug and socket devices to ensure that assembly is easy and fast.
Request for a quoteGermany
The Multilift Comfort range can be used as enclosed hoist for people and loads all around the world without any restrictions. It has been designed to correspond exactly to the international regulations (e.g. EN 12159). You may exchange the standard automatic control with the optional, even more user friendly level pre-selection control. For safety reasons the 2.5m high enclosure is electrically and mechanically blocked. This means the door of the enclosure can only be opened when the hoist is in the base unit. The Multilift Standard range is in no way technically inferior to the Comfort series, but its use depends on the regulations in the respective countries it is used. The hoists are delivered with an electrically surveyed low enclosure. This means that you cannot make the platform leave the base unit or that the platforms stops when a door is opened. Assembly is not carried out from the roof.
Request for a quoteGermany
The Multilift Comfort range can be used as enclosed hoist for people and loads all around the world without any restrictions. It has been designed to correspond exactly to the international regulations (e.g. EN 12159). You may exchange the standard automatic control with the optional, even more user friendly level pre-selection control. For safety reasons the 2.5m high enclosure is electrically and mechanically blocked. This means the door of the enclosure can only be opened when the hoist is in the base unit. The Multilift Standard range is in no way technically inferior to the Comfort series, but its use depends on the regulations in the respective countries it is used. The hoists are delivered with an electrically surveyed low enclosure. This means that you cannot make the platform leave the base unit or that the platforms stops when a door is opened. Assembly is not carried out from the roof.
Request for a quoteGermany
Wherever heavy loads have to be transported to great heights, the new GEDA BL 2000 ensures the necessary efficiency in the construction process. The person and material hoist has a load capacity of 2,000 kg or 23 people and a lifting speed of 55 m/min and the new power pack from GEDA is available as a single and twin variant. The platform size of 1.45 x 3.20 x 2.10 metres also enables the transportation of bulky goods up to a lifting height of 250 metres. To make the hoist even more convenient and user-friendly, it has been equipped with comprehensive state-of-the-art control variants. The GEDA BL 2000 is available in two variants, a Standard and a Premium model.
Request for a quote