HIGH QUALITY AT LOW PRICES! ! !

A modern metallurgy plant


The plant has two major production shops: the Melting Shop (the EAF shop) and the Rolling Mill.
According to the design, the melting shop consisted of two electric arc furnaces (the 1006 EAF) and two billet continuous casting machines (the CCM), all designed to produce about 700, 000 tonnes of steel per year. The total output in the first year of operation was as low as 206, 000 tonnes of steel billets. The installed metallurgical equipment appeared to be inoperative. Both the EAFs and the CCMs revealed certain deficiencies in the design that prevented the efficient operation of the units.
IIn 1985, the EAF shop started its modernisation to redesign and up-grade its production line No. 2 (the EAF-2 and the CCM-2). The work involved many foreign engineering companies and equipment suppliers.
As a result, the EAF shop shifted to the operation based on only one production line (the EAF-2, the Ladle Furnace, the CCM-2) in 1998.

Additional details

Key figures
  • 201 - 500
    Company headcount
  • 101 - 200
    Sales staff
  • 80%
    % of export sales
  • > 50.000 K€
    Sales turnover
Organisation
  • Year established 1981
  • Site status Site status Registered office, Parent company
  • Main activity Main activity Manufacturer/ Producer
    View secondary activities
    • Wholesaler
Markets and trading zones
Trading areas
Regional
National
European
International
area covered
area not covered
Commercial information
Incoterms

This company has not supplied these details.

Payment methods

This company has not supplied these details.

Banks

This company has not supplied these details.

Field of activity

Keywords associated with this company
  • Wires and cables, steel
A page for your business Can you see this? Your potential clients will too.
Join us now so you too can be visible on EUROPAGES
Add my business

EUROPAGES also recommends

93 v