Estonia
Distributor
Are you planning to build a hangar or warehouse? Our company sells and implements the mounting of low-rise buildings, based on the frame from cold-formed galvanized steel profiles.Questions and answers.Q. How long takes the building of the hangar? A. Depending on the difficulty and the size of the hangar, the order is being performed during 2-3 months from prepayment.Q. How to find out the cost of the frame? A. Send the draft of the supposed building with main dimensions to our e-mail. We will make an offer as soon as possible.Q. Do you perform the assembly of structures? A. Yes, we can carry out installation of the frame or to assist in the assembly, i.e. to make supervision installation.Q. Do you make a project? A. The customer with his order gets an assembly drawing and the object’s passport.
Portugal
Omega sections characterised as ΩTR60, ΩT110, ΩTR160, ΩTR210, ΩTR260; Profiles sold in EN 10346 steel: Hot-dip galvanised Z:200, 275 | Zin+Mag:175, 250; Drilling is carried out according to the position indicated by the customer.
Request for a quotePortugal
Omega sections characterised as ΩTR60, ΩT110, ΩTR160, ΩTR210, ΩTR260; Profiles sold in EN 10346 steel: Hot-dip galvanised Z:200, 275 | Zin+Mag:175, 250; Drilling is carried out according to the position indicated by the customer.
Request for a quoteCreate one request and get multiple quotes form verified suppliers.