There are 66 thousand bolt entries in our project, which is 40 meters high, where we manufacture 700 tons of steel and where we create each piece unique from the other. Our work, which we are happy to process parts of a whole, was used as a Solid Waste Facility after assembly.
Request for a quoteTurkey
In our project, which we carried out with Doğrar Metal, one of the prominent names in the sector, we followed the path by prioritizing high efficiency in an area of 750m². In our study, we obtained a whole by using bolts in European Standards. Our project has become ready for use in order to expand the working and storage area of the company.
Request for a quoteTurkey
We processed 1000 tons of steel for our project, which will cover an area of 16.800m². We prepared the parts of our work, in which each stage was developed in detail and meticulously, for assembly, and transferred them from Turkey to Northern Iraq without any problems.
Request for a quoteTurkey
Our project, which will share the story of Seval Cable, which has announced its success in its field, was designed to add efficiency to a small space. We took care of all the stages of our project, where we used 50 tons of steel. It was used as a Machine Platform after assembly.
Request for a quoteTurkey
We completed our project Ethiopia, which we designed and manufactured, and made the shipment. We design the most suitable structure for the companies we cooperate with and ship them all over the world.
Request for a quoteTurkey
We have done our steel structuring works for our project in Milas Ören. Our shipyard is 20 meters high and has a steel tonnage of 400 tons.
Request for a quoteTurkey
In the AYB Textile project, we have expanded the area of 2200 m2 to an area of 4400 m2. During the operations carried out while expanding the production area, we carried out the production without stopping and removing the machines inside. We would like to thank AYB Textile for this cooperation.
Request for a quoteTurkey
In the Abalioglu Feed Factory project located in Burdur, we have performed warehouse steel processing. we used 78 tons of steel on an area of 2000 m2.